Monday, 25 February 2013

Chrome: let it shine!

Valma chrome cleaner, an old towel and some patience....


Sunday, 24 February 2013

More (moral) support: Interior, wipes etc get done!

Great event: (moral) support was on it's way from the far north in The Netherlands:

And don't underestimate the (guardening) power of the dog. A great help!

With two we went on doing the sound insulation carpeting for the car, fantastic progress in just a weekend. (Headlining was done on Saturday).

Saturday, 9 February 2013

A Jag is not build by one man...

It's true the Green Lady can actually handle more than one man!
A friend and colleague offered to make his hands dirty, it took me less than a sec to be convinced...

After 60mins the new restored air filter was build in, piece of cake!

No issue to reward with a cold one later on.

Tuesday, 5 February 2013

A fresh air blowing in, restoring the driver air van

I always wondered why the airblower on the driver side was so silent...
Well, the common answer to 90% of your Jag issues: it must have been water.... And so it was....




And with some love and passion (and a 1000watt drill with iron brush!!) it looks like this...

Testing was done, the worn engine blows lake a hurricane. 1,5 hours for re-assembly, and the blower can be re-installed:





Saturday, 2 February 2013

Interior, getting the last parts in



Yes, finding the right parts to restore her is not easy. Just to give you as smell how my Saturday morning looked like:

8.00 Ready & fruity on the way
9.15 Carpet Right Oosterhout: I finally found it! The perfect (affordable) sound damping: Egalbase:

9.40 Jag Parts & Cars: great service, in one go I got the left door armrest, mid-console, and front door armrests. Ontop a good talk and some further advice on the Jag. A real recommendation.

12.30 Hornbach Breda. Great assortment. Got the spray glue (Bison) and tubes I need for the heater.
13.45 Arrival home. A great surprise, my wife ready with a fresh made lunch, what else is there to desire?